Product Detail :
|
Restoration of rain damages on link road to village kawalta km 0/0 to 3/0. Construction of balance work of R/wall at RD 2/980 to 1/997.50. Construction of link road from battargalu to tikkari sarainjubbar via tikkar km 0/0 to 3/0. Formation cutting 5/7 mtr wide in km 1/645 to 2/210. R/R damages on kuddu dhadi saraji road km 0/0 to 11/570. Construction of 6.00 mtr span RCC slab culvert at RD 7/360. Construction of link road to village ghurmu km 0/0 to 1/0. P/L cross drainage works at Rd 0/120, 0/445, 0/560 and 0/970 under SCSP. R/ R damages on various roads. Construction of breast wall at RD 8/675 to 8/685, 8/700 to 8/715, 8/720 to 8/750 and kharanja soling in km 8/570 to 8/750. Construction of link road at various places. F/C 5/7 mtr wide at various roads. Construction of HPC at RD 0/630, 0/790, 0/900. M/T to link road to village bharot km 0/0 to 0/300. P/L M/T works in km 0/0 to 0/300. Construction of langadhar to sarot road km 0/0 to 3/00. P/L kharanja soling at various RDs and Construction of breast wall at RD 0/330 to 0/360. Construction of retaining wall at RD 1/125 to 1/140, removal of slips from at various RDs and bed cutting between 0/225 to 0/315. Construction of road from prounthi to roilta km 0/0 to 1/500. Construction of breast wall in wire crate at RD 0/850 to 0/880 and P/L kharanja stone soling in slushy reaches in km 0/500 to 1/500.
|