|
Product Detail :
|
R/R damages on Chaura to Rupi road Km. 0/00 to 27/050. Construction of B/Wall at RD 15/010 to 15/020. R/R damages on KSC to Shong road Km 0/00 to 7/915. Construction of R/Wall with PCC Toe Wall at RD 3/895 to 3/910. R/R damages on Tapri Choltu Jani road Km 0/00 to 7/585. Construction of R/Wall at RD 6/070 to 6/080. R/R damages road old Tapri to Janakpuri Km 0/00 to 2/720. Construction of R/Wall in wire crate at RD 0/870 to 0/885. R/R damages on Tapri to Chholtu Punang KM 0/00 to 5/00. Construction of B/ Wall with PCC at RD 2/360 to 2/375. R/R damages on Karchham To Sapni road Km 0/00 to 8/300. Construction of R/Wall with CC Toe wall at RD 7/412 to 7/419. Annual Repair & MO HPPWD Rest House at Tapri. Dismantling and fixing bathroom tiles repair of various connections. R/R damages link road Karchham to Sapni Km 0/00 to 8/300. Construction of Random rubble masonry R/Wall at RD 6/980 to 6/998.80. Construction of 61 meter span bailey bridge over Baspa river on Shong Pallingche Road. Carrying out structure analysis & design including supplying of detailed drawings & estimate of both side abutments for 61 mtr Span TDR bailey Bridge. R/R damages on link road Nichar to Wangtoo Km 0/00 to 4/240. Proving and Laying Kharanja stone soling at RD 0/000 to 0/400. R/R damages on Chaura to Chotta Kamba road Km 0/00 to 16/00. Construction of R/Wall in wire crate at RD 11/800 to 11/822.50.15/200 to 15/225. R/R damages on Palingi to Nichar road 0/00 to 16/00. Construction of R/Wall at RD 3/790 to 3/800. R/R damages on Tapri Choltu Jani road Km 0/00 to 7/585. Construction of R/Wall at RD 6/040 to 6/054. R/R damages on Chaura to Majhgaon (Rupi) road 0/00 to 27/050. Construction of B/Wall at RD 19/035 to 19/050. R/R damages on link road from Kuppa to Palika Sariyo Km 0/00 to 5/00. Construction of R/Wall at RD 0/975 to 0/992. R/R damages on Palingi to Nichar road 0/00 to 16/00. Construction of R/ Wall at RD 1/975 to 1/986. R/R damages on link road Karchham to Sapni Km 0/00 to 8/300. Construction of Random rubble masonry R/Wall at RD 8/135 to 8/144.70. Preparation of detailed estimate of Construction of Primary Health Center at Rupi. Construction of Building Portion i/c W.S. & S.I. site development work, rain harvesting tank, septic tank, boundary around the building and approach road. R/R damages link road Karchham to Sapni Km0/00 to 8/300. Construction of Random rubble masonry R/Wall at RD 7/120 to 7/140. R/R damages on link road to Village Brua Km 0/00 to 5/800. Construction of R/ Wall in wire crate with CC toe wall at Taxi Stand Brua. Restoration of rain damages on Palingche to Shong road Km 0/00 to 3/600. Hiring of Hydraulic Excavator in working condition for removal of landslides/slips/ debris at Km 0/00 to 3/600. Restoration of rain damages on Various roads under Karchham Sub Division. Hiring of Excavator cum loader in working Condition for removal of Slips/Boulders/ debris on link road to Jani to Ramni Km 0/00 to 1/480 and link road to Village Yulla Km 0/00 to 2/835. RR damages on Palingi to Nichar road 0/00 to 16/00. Construction of R/Wall at RD 9/00 to 9/010. R/R damages on Tapri Choltu Jani road Km 0/00 to 7/585. Construction of R/Wall at RD 4/580 to 4/591. Construction of Link road to EMRS Km. 0/00 to 1/650. Construction of R/Wall at RD 1/360 to 1/378. R/R damages on Jeepable road from Katgaon to Katgaon Kanda Km. 0/00 to 5/500. Construction of B/Wall at RD 2/285 to 2/305) under PDNA. Restoration of rain damages on Various roads under Karchham Sub Division. Hiring of Excavator cum loader in working condition for removal of Slips/Boulders/ debris on KSC to Shong road Km 0/00 to 4/00 and Sapni road Km 0/00 to 5/00. Restoration of rain damages on Hot Water spring to Village Nathpa Km. 0/00 to 9/735. Hiring of Excavator cum loader in working condition for removal of Slips/ Boulders/debris between Km 0/00 to 9/735.
|